Project: Naham Sanat Factory & Warehouse Complex ((Exclusive Iranian Partner of Parker and Enerpac Hydraulic pomps )

Design & Supervision Period: 2007–2021
Total Built-up Area: 3,500 m²
Floors: 3 Levels
Scope: Integrated Industrial Production, Storage & Administration
Location: Parand Industrial Town, Tehran Province

Architectural Services by Mirzadeh Office:

  • Architectural Design (Phase 1 & 2)
  • Structural Execution Management (Foundation to Skeleton Completion)
  • Comprehensive Finishing Supervision

Client: Naham Sanat Industrial Group

Facility Layout

U-Shaped Process-Driven Masterplan

Zone

Function

Key Features

Production

Heavy machinery operations

10m clear heights • 5-ton crane runways

Warehouse

Raw material/product storage

Drive-through racking • Loading bays

Administration

Process monitoring & offices

Glass curtain wall • Oversight galleries

Industrial Design Innovations

  • Structural Expressionism:
    • Exposed architectural concrete columns
    • Double-layer steel roof systems with thermal breaks
  • Logistics Optimization:
    • Dedicated 18-wheeler circulation loop
    • Elevated loading docks with hydraulic platforms
  • Architectural Landmark:
    Dynamic rotated entry tower with corporate identity lighting

Technical Highlights

  • Safety compliance features (fire suppression specs, emergency routing)
  • Expansion capabilities shown in masterplan diagrams